2 week downtime reduced to 4 days

Pharmaceutical company Teva is obliged to rebuild its test system annually. Due to the system size of 10 TB, the previously utilized extraction tool was pushed to its limits.

The goal was a lean system copy to reduce data volume, storage space and adminis- trative expenditure and to simplify the test run.

 
Teva managed to:
 
  • reduce two week downtime to four days
  • completely eliminate manual post processing

  • save storage space costs of €100,000

  

“With help from Datavard, we were able to reduce two week downtime to 4 days; manual post processing was completely eliminated. On top of that, we saved storage space costs of €100,000.”

Stefan Piehler, Teva

 